Small shop, two of us. We quoted a project in March, fixed price, and since then the client has added a booking flow, a second language, and what they call 'a small dashboard'. The number on the invoice is still the one from March. I keep telling myself the next request is where I draw the line and then I don't. Curious how other people handle this without blowing up the relationship.
The project requirements keep changing, but the price hasn't
Change order or walk away. There's no third option that doesn't cost you money.
A lot of this comes down to what your paperwork says. I moved to a written scope with an explicit list of exclusions and a separate rate for anything outside it. Clients still test the boundary but the conversation is short now. First Time I sent something back with a number attached, the client suddenly remembered which features were actually must haves.
Is this a fixed bid or are you just quoting a number and hoping? Different problems.
Walking away is easy to recommend when you have a pipeline. Most small shops don't. I've eaten scope creep before because the alternative was an empty month, and honestly I'd probably do it again.
Had a client last year where a small addition quietly turned into a second project. I didn't notice until I totalled my hours and realised I'd been working at roughly 40% of my rate for six weeks. What finally worked was a short weekly note listing everything added since the previous version, with hours next to each line. No lecture, no negotiating, just the the list. They dropped two of the four open requests themselves without me asking
Do you have a scope document at all? Any written record?
Charging for the planning phase separately changed this for me. People get much more decisive once thhey've already paid for the thinking part.
The exclusions list is the part everyone skips. Describing what's in scope isnt enough on its own. The things you won't do need to be named individually.
Verbal agreements are worth nothing here. Learned that the hard way.
The underlying issue is that a fixed price reads as unlimited to a certain kind of client. They're not usually being malicious about it. They see one number and assume everything before that number is included.
Raise your prices and build the churn into them. Not a popular answer.
Contracts don't stop this in practice. I've had signed change order language and still spent an entire afternoon arguing about whether a new screen counted as a minor adjustment. What actally helps is deciding early which clients get flexibility and which don't and then being consistent about it. The paperwork is mainly there for the people who won't accept a no.
To answer the question upthread, there's a scope document, but it was written in about twenty minutes and it's vague exactly where it matters. The additions have mostly come through calls rather than email, which I now understand is the real problem. Two of them I agreed to on the spot because it was faster than pushing back, and that part is on me. What I'm stuck on is whether to reopen the pricing now or absorb it and fix the process for the next client.
Reopen it now. If you absorb this one, the next three arrive at the same price and you've taught them the number is soft. An awkward call is cheaper than another six weeks at half rate.