My business partner is pushing to sign a lease for a second retail/production space next month. Problem is our current production is already held together with tape. We do small-batch sauces, and we're maxing out our filling line and cold storage most weeks. They think expansion will force us to grow into it. I think we'll just be worse at twice the square footage. Anyone dealt with a partner who wants to expand before ops can actually handle it? How did you get them to see the math without it turning into a fight?
My partner wants expansion before we can handle production
“Grow into it” is what people say right before buying a second fridge they can’t fill. What does expansion mean here—more retail space, more production, or just a bigger sign?
The retail/production combo is the trap. You’ll be paying for square footage while your filling line decides your actual revenue. If the line is maxed, extra space just gives you room to stack empty jars. I’d make them run a week of orders through the current setup and mark where it breaks. Not a spreadsheet argument; a this this-is-where-we-lose-money argument.
Is the partner doing production or just signing things?
I was the cautious one in our bakery, and expansion did force us to systemize. But we had a genuine capacity plan, not vibes. If your partner can’t name the third step that happens after the lease is signed, it’s not a plan. Also, cold storage rental math gets ugly fast
What’s the actual bottleneck? Filling, labor, refrigeration, or sales?
Cold storage is usually the one people underestimate because it looks like just space. But if filling is the bott leneck, renting fridges won’t help unless you add shifts or equipment. Have you looked at a co-packer for the overflow? Not always cheaper at small volume though.
Co-packer minimums arre brutal, yeah. We got one quote that would eat most of the margin unless we doubled volume. The bottleneck is filling + cold storage, and the lease would add retail space but only 200 sq ft of usable production. Partner keeps saying we’ll hire for the second shift, but we haven’t found one reliable person for the first shift.
A second shift with no first-shift lead is just a second way to miss orders. I’d get the lease terms and the equipment quote on one page and ask what happens in month four when neither has paid for ittself. Not glamorous, but neither is hauling sauce at 2am.